While the industry has evolved, some skills remain constant. For instance, our team will inspect your floor to ensure it is suitable for a timber installation. We will also include a moisture barrier for all floors that bond over a concrete sub-straight. This restricts moisture evaporation by creating a seal from the bottom to the top of your timber flooring. We will also install timber floors when we deliver and leave for about two weeks to acclimate in situ. This ensures we achieve the best results and the most stable floor.